Language: English
MISH 20–24

Field Manual Safety Manual

Fall & Access Safety

Signs and barricades, fall protection, scaffolds, ladders, and protection of open floor surfaces.

Public purpose and scope preview for this section cluster

Revision 3.0 · Effective 7/1/2026 · Aligned with OSHA 29 CFR 1926 and AGC CSEA expectations.

Public preview only. This page shows the public Purpose, Scope, and reference resources for each section. Full procedures, forms, and proprietary controls are restricted — request access or request access.
MISH 20

Signs, Signals & Barricades

OSHA:
29 CFR 1926.200
Rev:
3.0 · 7/1/2026

Public preview unavailable for this section. Sign in or request access for the full text.

MISH 21

Fall Protection (Forms: Fall Protection Inspection)

OSHA:
29 CFR 1926.502
Rev:
3.0 · 7/1/2026

Public preview unavailable for this section. Sign in or request access for the full text.

MISH 22

Scaffolding Use & Handling (Forms: Scaffold Inspection)

OSHA:
29 CFR 1926.451
Rev:
3.0 · 7/1/2026

Public preview unavailable for this section. Sign in or request access for the full text.

MISH 23

Ladder Use & Care

OSHA:
29 CFR 1926.1053
Rev:
3.0 · 7/1/2026

Public preview unavailable for this section. Sign in or request access for the full text.

MISH 24

Open Floors & Holes

OSHA:
29 CFR 1926.502
Rev:
3.0 · 7/1/2026

Public preview unavailable for this section. Sign in or request access for the full text.

Route To Implementation

Apply this safety guidance to active scopes

Connect this cluster to a service line, regional service area, and live planning path to move safety standards into execution.

Project briefing | RES

Bring the mission, constraints, and required outcome.

Estimating qualifies the opportunity, CHNAV owns intake and routing, and COO provides escalation and backup. Submission does not create a contract, confidentiality duty, or commitment to bid.

Word From the General

My commitment on every page is the same: clear planning, disciplined execution, and communication that keeps the mission, the schedule, and the build aligned.

- Jeremy ThamertOwner & Chief Executive Officer