Su próximo proyecto
Comparta la ubicación, los plazos y las restricciones conocidas. Nuestro equipo de desarrollo de negocios revisa su solicitud y coordina los próximos pasos con preconstrucción cuando corresponda. El envío no crea un contrato, una obligación de confidencialidad ni un compromiso de presentar una oferta.
Word From the General
My commitment on every page is the same: clear planning, disciplined execution, and communication that keeps the mission, the schedule, and the build aligned.
- Jeremy ThamertOwner & Chief Executive Officer

INDUSTRIAL FOOD PROCESSING / PUBLIC PROJECT RECORD
Authentic field documentation for a Darigold production facility in Pasco, held to the facts the public record can support.
02 / ESSENTIAL FACTS
The page carries the project identity, place, market, capability, and publication-safe status without filling gaps with inference.
03 / DOCUMENTED WORK
The Darigold Pasco Production Facility is an industrial food-processing project in Pasco, Washington.
The public record pairs the facility identity and market with authentic MH Construction field documentation of exterior conditions. The available record supports a food processing facility capability connection while keeping MH’s exact contractual scope and ownership of photographed elements outside the public claim.
04 / PROJECT EVIDENCE
Authentic project media is the primary evidence. Each image stays tied to the facility condition it visibly documents.

Facility frontage showing marked accessible parking stalls in the captured site record.

Row of loading dock doors with adjacent parking and circulation area.

Main entrance elevation with landscaped frontage and parking stalls.
The hero image and the three supporting images are four distinct controlled project photographs, not repeated crops presented as separate evidence.
05 / CAPABILITY CONNECTION
The documented connection is intentionally narrow: industrial food processing and food processing facility capability. Broader construction services remain available through the existing MHC service system, but this record does not claim that every capability was performed on this project.
06 / NEXT ACTION
Share the place, the constraints, and the required outcome. Start with the conditions that need to be clear before mobilization.
Start a project briefing